<dd id="giqkq"></dd>
<optgroup id="giqkq"></optgroup>
  • <dd id="giqkq"><center id="giqkq"></center></dd>
  • <center id="giqkq"></center>
  • <optgroup id="giqkq"></optgroup>
    <dd id="giqkq"></dd>
  • <dd id="giqkq"><center id="giqkq"></center></dd>
    <nav id="giqkq"><optgroup id="giqkq"></optgroup></nav>
    <dd id="giqkq"></dd>
    <dd id="giqkq"><center id="giqkq"></center></dd>
  • 亚洲精品无码不卡在线播HE
    <dd id="giqkq"></dd>
    <optgroup id="giqkq"></optgroup>
  • <dd id="giqkq"><center id="giqkq"></center></dd>
  • <center id="giqkq"></center>
  • <optgroup id="giqkq"></optgroup>
    <dd id="giqkq"></dd>
  • <dd id="giqkq"><center id="giqkq"></center></dd>
    <nav id="giqkq"><optgroup id="giqkq"></optgroup></nav>
    <dd id="giqkq"></dd>
    <dd id="giqkq"><center id="giqkq"></center></dd>
  • Fushun Marine Loading & Unloading Equipment Of Fluid Co.,Ltd
    www.www.66chuangye.com
     
     
     
    Order Note
    REFER TO DESIGN DATA LIST WHEN ORDER
    Data list of design system of Loading Arms
    Design data List of Truck and Railcar Loading Arms
    Data frame of design system of Loading Arms

    Data list of design system of Loading Arms(Download)

      Meter Specification
    A   Diameter of loading Arms
    B   Types and specifications of flange connecting to oil pipe on jetty
    C   Height of entrance flange to berth face
    D   Height of the highest tide level to berth face
    E   Maximum tidal range
    F   Height of ship rail
    G   Minimum distance between flange face and ship edge
    H   Height of ship flange centreline to the highest tide level
    (maximum ship with unload)
    I   Height of ship flange centreline to the lowest tide level
    (minimum ship with full load)
    J   Minimum height of ship flange centrelinge to deck
    K   Maximum height of ship flange centrelinge to deck
    L   Distance between centreline of riser and berh edge
    M   Minimum distance between berth edge and ship flange
    N   Maximum destance between berth edge and ship flange
    O   Distance of risers of neighbour Loading Arms
    P   Wind load: woking state:KPa no working state:KPa
    Q   Earthquake intensity
    R   Control fornual: hydraulic:(handle electric)
    S   Number
    T   One control system control some Loading Arms
    Loading Arms   No Number Cargo Density(kg/m3) Working
    pressure
    (Mpa)
    Temperature℃
      1          
      2          
      3          
      4          

     

     
    Fushun Marine Loading & Unloading Equipment Of Fluid Co.,Ltd
    Address:13-1 Qingcaogou Langping Road Dongzhou Distric Fushun City,Liaoning Province,China  
    Tel:86-024-54641516    Fax:86-024-54641517   Post code:113004
    URL:http://www.www.66chuangye.com  E-mail:fshylt@163.com